Project Details
Strengthening Capacity to Design and Implement Water and Rural Infrastructure Facility (hereinafter called the (“Technical Assistance”) to the Government for the Bangladesh: Irrigation Management Improvement Project (Topographic Survey to assess technical
2021
Completed
["Urban Planning and Design"]
The main objective of the project is to Strengthening Capacity to Design and Implement Water and Rural Infrastructure Facility (hereinafter called the (“Technical Assistance”) to the Government for the Bangladesh: Irrigation Management Improvement Project. To achieve the main objective, the consultants have to provide services to the followings: Car-ryout topographic surveys of the cross section and maximum and minimum water levels in khal. Make a note of the condition of all structures. Make a note of the type and size of the pump: size (inch or mm), power rating (kW), usual or rated discharge (l/s). Take 5-10 cap-tioned photos for each scheme of key / critical structures including pump, header tank, and at least two standpipes and two outlets. Field visit Detailed description of actual services provided by the staff: Survey Report: Salient information (name of scheme, upazila, date commissioned, design command area, actual command area, number of farmers, name of pump operator, energy used in previous irrigation season, irrigation ser-vice fees paid, etc.). Information of the pump: Type and rating (kW), Flow (l/s). For each outlet: (i) receives good flow, (ii) receives poor flow, or (iii) receives no flow. Topographic data for buried pipelines, structures (header tank, stand-pipes, and outlets) recorded in tabular format: Name of structure, GPS coordi-nates (degrees, minutes, seconds), Elevation, height, etc. with short description of condi-tion of structure. Map showing Khal, header tank, pipelines, standpipes and outlets, com-mand area.
Asian Develop-ment Bank (ADB)
Asian Develop-ment Bank (ADB)
foreign