Project Details
DMLC OFFICE BUILDING : PROPOSED B1+G+7 =8(EIGHT) STORIED OFFICE BUILDING WITH BASEMENT
2024
Completed
["Feasibility Study and Design","Architectural Engineering Solution"]
- Architectural design and drawing
- Structural Design and Drawing
- Cost Estimation as per PWD rate schedule (2022 revised)
GoB(Government of Bangladesh)
Department of Military Lands and Cantonment (DMLC)