Project Details

DMLC OFFICE BUILDING : PROPOSED B1+G+7 =8(EIGHT) STORIED OFFICE BUILDING WITH BASEMENT

2024

Completed

["Feasibility Study and Design","Architectural Engineering Solution"]

  • Architectural design and drawing
  • Structural Design  and Drawing
  • Cost Estimation as per PWD rate schedule (2022 revised)

GoB(Government of Bangladesh)

Department of Military Lands and Cantonment (DMLC)