Project Details

Feasibility Study of savar Cantonment Board Health Complex [ B2+B1+G+9 = 10 (TEN) Storied Building ]

2024

Completed

["Feasibility Study and Design","Architectural Engineering Solution"]

  • Social- Economic Survey
  • Environment Survey
  • Topographic Survey
  • Study and Report Preparation: -
    Market/Demand  Analysis, Technical/Technological and
  • Engineering Analysis:-
    Environmental Sustainability Analysis and EIA
  • Climate Resilience and Disaster Risk Analysis (DIA)
    cost-Benefit Analysis
  • Human Resources and Administrative Support Analysis
  • Institutional and Legal Analysis
  • Risk (Uncertainty) and Sensitivity Analy

GoB(Government of Bangladesh)

Savar Cantonment Board