Project Details
Feasibility Study of savar Cantonment Board Health Complex [ B2+B1+G+9 = 10 (TEN) Storied Building ]
2024
Completed
["Feasibility Study and Design","Architectural Engineering Solution"]
- Social- Economic Survey
- Environment Survey
- Topographic Survey
- Study and Report Preparation: -
Market/Demand Analysis, Technical/Technological and - Engineering Analysis:-
Environmental Sustainability Analysis and EIA - Climate Resilience and Disaster Risk Analysis (DIA)
cost-Benefit Analysis - Human Resources and Administrative Support Analysis
- Institutional and Legal Analysis
- Risk (Uncertainty) and Sensitivity Analy
GoB(Government of Bangladesh)
Savar Cantonment Board